Tel: +86-05356371758
E-mail: altrosteelhouse@hotmail.com
Product Categories
Contact Us

Yantai Aoxin International Trade Co.,Ltd

Email: altrosteelhouse@hotmail.com

Tel: +86-535-6371758

Mobile: +86-15066753135

Fax: +86-535-6396529

Address: Huangshan Road No.90 Etdz, Yantai City, Shandong Province, China

Zip: 264006

Retaining Wall Posts

Easy Install Retaining Wall With H Steel Post

Install Retaining Wall with H & C Steel Post Step one: concretc the end posts Step two: install the joiner posts Step three: Building the corners Step four: Slot in the sleepers Step five: Install the drainage Step six: Add capping and finish END POST JOINER POST CORNER POST Contact Us...

Products Details:

Install Retaining Wall with H & C Steel Post


Step one: concretc the end posts

1.jpg

Excavate two 550mm deep holes for the end post. Pour in concrete to 600mm from the top, use a spirit level to check for plumb in both directions then check the post is the right height. TIP A 20KG bag of cement, mixed with gravel and sand fills three holes.


Step two: install the joiner posts

2.jpg Set up a stringline to use as a guide then postiton a base sleeper in each end post. Position the joiner posts then dig 550mm deep holes and concrete them into position using a spirit level to plumb. Aligning them with the stringline and leaving to dry.


Step three: Building the corners

3.jpg Position and concrete the corner posts. Using a builder’s square to install the sleepers at 90 degree to the wall. TIP to building steps later we added a 1200mm deep and 2400mm wide recessed area. Incorporation four conrner posts.


Step four: Slot in the sleepers

4.jpg Position the base sleepers, leveling and packing them to leave exaxtly 400mm of post above thn install the middle and top rows. TIP check the height of the top sleeper matches the post so the capping sits flush along the wall.


Step five: Install the drainage

5.jpg Position geotech filter cloth behind the wall and fold it over the sleepers. Install 20m of 100mm pope with clear exits at the ends then cover with 20mm gravel to 300mm deep folding the cloth back to separate the drainage and backfill.


Step six: Add capping and finish

6.jpg Square cut and mitre the capping, apply construction adhesive to the ends and secure to the sleepers with 75mm*14g galvanized bugle screws then used a router with a round over bit to remove splinters and trim the edges. Apply two coats of decking stain.


END POST

7(001).jpg

SIZE: 50MM 75MM

LENGTH:1200MM 1500MM 1800MM 2000M 2100MM 2400MM 3000MM 3600MM 4200MM

SURFACE TREATMENT: HOT DIPPED GALVANISED WITH AVERAGE ZINC LAYER THICKNESS OF 85UM .


JOINER POST

8(001).jpg

SIZE: 50MM 75MM

LENGTH: 1200MM 1500MM 1800MM 2000M 2100MM 2400MM 3000MM 3600MM 4200MM

SURFACE TREATMENT: HOT DIPPED GALVANISED WITH AVERAGE ZINC LAYER THICKNESS OF 85UM .


CORNER POST

9(001).jpg

SIZE: 50MM 75MM

LENGTH: 1200MM 1500MM 1800MM 2000M 2100MM 2400MM 3000MM 3600MM 4200MM

SURFACE TREATMENT: HOT DIPPED GALVANISED WITH AVERAGE ZINC LAYER THICKNESS OF 85UM .


Contact Us

YANTAI AOXIN INTERNATIONAL TRADE CO.,LTD

Add: HUANGSHAN ROAD No.90 ETDZ, YANTAI CITY, SHANDONG PROVINCE, CHINA

Tel: +86-535-6371758

+86-535-6370829

Fax: +86-535-6396529

E-mail: altrosteelhouse@hotmail.com

Hot Tags: easy install retaining wall with h steel post, China, suppliers, price


Yantai Aoxin International Trade Co.,Ltd